Description
TRT Minecart
Tunneling - Roadbed - Track
Turn minecarts into automated machines for tunneling, roadbed construction, and track laying.
Loaders
Environments
Progress
Check out the latest development progress here: Development Progress
Gallery

Features

Tunneling
- Place pickaxes in the hopper minecart. It will attempt to mine a 3 × 3 area in the direction of travel. Block drops follow the properties of the pickaxe.
- Blocks without collision shapes or with rails on top are not mined during excavation.
Roadbed Laying
Place blocks in the hopper minecart. It will lay them in a 3-block-wide path in the direction of travel.
Track Laying
Place rails in the hopper minecart. When the minecart is about to leave the existing track, it will place rails beneath itself to extend the track.
Independent Features
The features are independent of each other. You can enable only the features you need.
Recommended Item Order
To control the execution order, place items as follows:
Pickaxes -> Blocks -> Rails
- Pickaxes first for tunneling.
- Blocks in the middle for roadbed laying.
- Rails last for track laying.


