tornandons_liminality-beta-0.4.7-neoforge-1.21.1.jar
Curse Maven Snippet
What's new
Adjusted structure spawning to create an infinite parking lot dimension. The portal to the dimension changed to frame metal. the dimension is not naturally gotten to. it must be place by a dev of the world. as well as the portal to the next level.
All Relations
- All Relations
- Embedded Library
- Optional Dependency
- Required Dependency
- Tool
- Incompatible
- Include
This mod has no related projects

