Peterwolf's Groundworks Bulldozer 0.3.1+1.21.8
Curse Maven Snippet
What's new
[0.3.1+1.21.8] - 2026-10-28
Improved
- Natural Rolling Spoil Mound (Naturalna pryzma urobku):
- Replaced the artificial 11-lobed lumpy boils and sine-wave ripples with a natural, continuous parabolic rolling earth surcharge.
- The pile now forms a strong, authentic crest against the face of the moldboard and rolls down in a smooth convex angle-of-repose slope toward the leading toe.
- Smooth lateral tapering across the blade wings with seamless multi-material banding.
- When the blade is angled, the mound dynamically shifts toward the trailing discharge wing.
- Enhanced Angled Windrow Side Discharge (Usypywanie wału na bok):
- Fixed an issue where side discharge was blocked when cutting below surface level due to a strict height check against the cutting edge.
- Allowed windrow deposition to mound up to 2 blocks high above the blade grade level.
- Increased maximum lateral flow rate at full blade yaw from 96 to 512 units/tick for the standard bulldozer, and from 192 to 1536 units/tick for the heavy bulldozer (1 to 3 full blocks per tick), producing a rich, continuous windrow ridge.
All Relations
- All Relations
- Embedded Library
- Optional Dependency
- Required Dependency
- Tool
- Incompatible
- Include