File Details
0.1.6-1.20.1-beta-Fabric
- B
- Feb 19, 2026
- 1.81 MB
- 22
- 1.20.1
- Fabric
File Name
arknights_endfield-0.1.6-1.20.1-beta.jar
Supported Versions
- 1.20.1
Curse Maven Snippet
2026-02-18
- 优化各个矿机,提取基类
- Optimized various mining rigs and extracted base classes
2026-02-17
- 供电桩、中继器现在可以实现断点重连,即当它连接的前一个节点被移除了,那么它会自己重新寻找在连接范围内且最近的节点进行连接
- Electric Pylons and Relay Towers can now implement breakpoint reconnection. If the previous node they are connected to is removed, they will automatically search for the nearest node within the connection range to connect to.
2026-02-16
- 优化工业设备,现在用电工业设备可以储备
10000 EFU(Endfield Units)的电力,增加一定的容错,避免电力不足导致的设备停机 - Optimized industrial equipment. Now, powered industrial equipment can store
10000 EFU (Endfield Units)of electricity, providing some fault tolerance to prevent equipment shutdown due to insufficient power - 工业设备如果电力储备充足且不处于工作状态时,不会再消耗电力
- When industrial equipment has sufficient power reserves and is not in working state, it will no longer consume electricity
2026-02-11
- 完成各炮台的白模搭建,但尚未加入模组中
- Completed the white model construction of each gun tower, but has not yet been added to the mod
2026-02-08
- 新增
全局电网节点管理器,用于处理供电桩、中继器之间的自动连接 - Added
Global Power Network Node Managerto handle automatic connections between Electric Pylons and Relay Towers
2026-02-07
- 测试验证炮台,优化转向效果
- Tested and verified the gun tower, optimized the turning effect
2026-02-06
放置预览试验阶段完成,开始正式编写- The
placement previewtesting phase is complete, and formal writing begins - 完成各
GUI的简化,基类提取完成 - Completed simplification of various
GUIs, base class extraction completed
2026-02-05
- 开始优化各
GUI,并提取基类 - Started optimizing various
GUIsand extracting base classes
2026-02-04
- 完成
工业设备方块实体类的优化,基类提取完成 - Completed optimization of
industrial equipmentblock entity classes, base class extraction completed
2026-02-03
- 优化各
GUI,降低渲染负载 - Optimized various
GUIsto reduce rendering load
2026-01-12
- 开始整理重构现有的
工业设备相关类,提取基类,减少重复代码 - Started organizing and refactoring existing
industrial equipment-related classes, extracting base classes to reduce code duplication
2026-01-11
- 尝试使用
Transfer API来处理各个方块实体中的物品传输逻辑,不再直接使用原版的类 - Attempted to use
Transfer APIto handle item transfer logic in various block entities, no longer directly using vanilla classes
2025-12-24
- 整合并测试之前的管道
- Integrated and tested previous pipelines
2025-12-16
- 初步试验管道
- Initial testing of pipelines
2025-12-15
- 初步试验传送带
- Initial testing of conveyor belts
2025-12-14
- 继续重构并优化电网,工业设备将直接接入全局电网,由全局电网负责所有电力运算逻辑
- Continued to refactor and optimize the power grid. Industrial equipment will be directly connected to the global power grid, which is responsible for all power calculation logic.
2025-12-12
- 所有测试版停止更新,发布模组未来开发计划,参见未来计划
- All beta versions have stopped updating. The future development plan of the mod is released. See Future Plans
2025-12-10
- 重构电网,新增一个物品用于模拟电力运输
- Refactored the power grid and added a new item to simulate power transmission
2025-12-08
- 继续优化供电桩逻辑
- Further optimized the logic of Electric Pylon

