blackstart-1.2.0-part1.jar
Curse Maven Snippet
What's new
Black Start 1.2.0 – Grid Update (Part 1)
NEW: High-Voltage Power Lines
- Huge lattice transmission towers. Placed as a single item with a green/red placement preview.
- Real sagging power lines between towers, up to 96 blocks apart.
- Carry electricity hundreds of blocks away from your power plant.
NEW: Transformers
- Step-up Transformer: turns your plant's output into high voltage for long-distance lines.
- Works with AC only. DC must go through an inverter first.
- Each transformer loses 2% of the power passing through.
NEW: Realistic Power Loss
- Normal cables now lose power over distance: about 15% at 100 blocks, 45% at 300 blocks and 75% at 500 blocks.
- High-voltage lines lose only about 0.5% per 100 blocks.
- Loss is shown on machine screens and the Electricity Meter.
- Short cable runs inside your base are barely affected.
NEW: Village Electrification
- Village Transformer: place it near a village bell and connect a high-voltage line.
- Powered villages light up, hostile mobs stop spawning nearby and villager prices drop.
- Each village has a name and its own power demand, which rises at night.
- Blackouts: if your plant can't keep up, the village goes dark. When power returns, the lights come back on one after another.
Power plants and village transformers keep their chunks loaded, so the grid keeps working while you're far away. This can be turned off in the config.
IMPROVED
- New cooling tower model with a smooth hyperbolic shape, support legs and a water basin.
- New "Grid" research branch and guide chapter.
This mod has no additional files