Kerbal Mobile Refinery

10 Part Orbital Refinery/Mining Base
Here the Kerbal Mobile Refinery is seen preparing to land on Minmus to begin refueling.

Here the Kerbal Mobile Refinery is seen preparing to land on Minmus to begin refueling.

Here the Kerbal Mobile Refinery is seen landing on Minmus to begin refueling.

Here the Kerbal Mobile Refinery is seen landing on Minmus to begin refueling.

Here the Kerbal Mobile Refinery is seen mining and converting ore simultaneously. complete refueling takes roughly 10 days depending on the length of solar exposure at the landing site.

Here the Kerbal Mobile Refinery is seen mining and converting ore simultaneously. complete refueling takes roughly 10 days depending on the length of solar exposure at the landing site.

Description

The Kerbal Mobile Refinery, hereby referred to as KMR, must be constructed in orbit from 10 segments. Once constructed the KMR can hold 2400 units of ore, 13095 units of liquid fuel, 16005 units of oxidizer, and 71226 units of electric charge. With this arsenal of resource generation it is capable of refueling itself on any orbital body with a gravity equal to 0.115 of that of Kerbin, or less, while fully constructed. Once the Titan supertanker segment is removed, the remaining 9 segments of the KMR are capable of landing safely and refueling on larger Orbital bodies. like Laythe.

The Kerbal Mobile Refinery Team

profile avatar
  • 4
    Projects
  • 6.0K
    Downloads

More from _ForgeUser15911669